Interpro Technical Services Ltd. - Steam turbine specialists  
INTERPRO
>> Power Generation

 

“They (the marine turbines) proved to be extremely reliable... As an example of this reliability, the main propulsion turbines of the U.S.S. Iowa class battleships, which were designed and manufactured to the same standards, required no significant refurbishment when these ships (Iowa, Missouri, New Jersey) were returned to active duty (after 30 years mothballed).” 

Fred Kindl, President, Encotech Engineering, P.C., Schenectady, N.Y.
A Unique Opportunity For Power Generation

Never-used, mint-condition U.S. Navy
turbines adapted for industrial applications.

bulletState-of-the art modern LP or HP turbine-generator packages
condensing or non-condensing packages available
bulletCost effective, quick delivery and installation
bulletUnparalleled turbine durability and reliability

Find out more about these amazing marine steam turbines here

What are others saying about these units? (testimonials)

The artist and his assignment - John Batchelor

General Electric Steam Turbine Power Package - Issues and Answers (PDF 389KB)

USS Oregon City by John Batchelor

Abstract from Issues and Answers PDF:

The steam turbine component could be shipped to site within about ten weeks from the date of order, anywhere in North America. Complete installation of the turbine-generator set would take only as long as the arrival of the new equipment components, principally the generator and gear reducer. That being said, the time for the complete set in service should be approximately half that of the 14 months to two years customarily required by the manufacturers of new steam turbine generators.

The equipment has unsurpassed flexibility. One or more HP and/or LP turbines can be linked. A set of four LP turbines would consistently deliver 44-48 megawatts. Optionally, synchronous self-shifting clutches can be provided, clutching and declutching one or more HP or LP admission units automatically to increase and decrease capacity as needs arise, or as plant operational variables dictate the availability of high or low pressure steam.

Cutaway of turbine installation by John Batchelor